Aguarde...
 

YABOG PIPELINE


    R$ 157,70

    em até 5x de R$ 31,54 sem juros no cartão, ver mais opções
    Produto sob encomenda
    Previsão: 6 Semanas + Frete

     
    Frete grátis para compras acima de:
    Sul e Sudeste: R$ 99,00
    Centro-Oeste e Nordeste: R$ 109,00
    Norte: R$ 139,00
    Confira o regulamento

    Calcule prazo de entrega e frete:

     - 

    Sinopse

    Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. YAbog (Yacimientos-Bolivian Gulf) pipeline is a 441 kilometres (274 mi) long natural gas pipeline, which connects Río Grande in Santa Cruz de la Sierra, Bolivia, with Campo Duran in Salta Province, Argentina. THe pipeline was commissioned in 1972. A Contract concerning YABOG pipeline between the Government of Bolivia and oil companies YPFB and Gulf Oil was signed in August 1968. FInancing for the project was provided by the World Bank and US private firms. THe construction began in 1970 and the pipeline began operating in 1972. THe diameter of the pipeline is 24 inches (610 mm) and the annual capacity is 6.2 billion cubic meter. THe Bolivian section is operated by Transredes, a subsidiary of YPFB, and the Argentinian section is operated by Transportadora de Gas del Norte, a subsidiary of Gasinvest S.A.

    Detalhes do Produto

      • Ano de Edição: 2010
      • Ano:  2010
      • País de Produção: Germany
      • Código de Barras:  9786130955168
      • ISBN:  6130955162
      • Encadernação:  BROCHURA
      • Altura: 220.00 cm
      • Peso: 0.14 kg
      • Quantidade de Itens do Complemento:  0
      • Nº de Páginas:  84

    Avaliação dos Consumidores

    ROLAR PARA O TOPO